Monday, November 28, 2011

fax20111129kseb

latest

12/03/11 07:31:35 PM GMT
AT LAST !
the transformer is going to be commissioned on 20111206, that is what the KSEB executive engineer nedumangad assures; thank goodness.
Well; all is well that ends well.




Dukh bhare din beethe re bhayya . . . .. . . . .
*  *  *  *

andhakarathil ahalyayepole

it is almost three weeks 
since the transformer has been hanging from the posts at kayapadi
 not yet charged 


FAX to KSEB
TRANSFORMER @ KAYIPADI
REQUEST EXPEDITE COMMISSIONING  OF
* * *

Dr. Cheriyath Jyothi B.Sc., M.B.,B.S.,
theCloister
nr rockPark, venkode P.O., thiruvananthapuram - 695028
Consumer no.16209-0 kseb



No.2011/ele/memD                                   november 28, 2011

REQUEST EXPEDITE COMMISSIONING OF
TRANSFORMER @ KAYAPADI
under vellanad section, thiruvananthapuram Dt.

         as explained in the various letters ( including my letter no.201106/kseb/a dt. June 17, 2011 to the member distribution, handed over in person to the member's office ) and eMails and as evidenced by the accompanying photographs, the voltage of power supplied by the kseb over here is a disgrace to any civilised set up.

             the installation of a transformer at kayapadi would have brought enormous relief to the locality. It was with a sigh of relief that ordinary mortals like me saw the work on the installation starting at last - the transformer had already been sanctioned long back..

         But even after almost three months of starting work on the installation of the transformer, all that we have at the moment are the repeated shut offs of even the extremely low voltage current for most part of the day.

    I am afraid the concerned authorities are dragging their feet on the matter.

IT SEEMS TO BE AN ENDLESS WAIT!
Could somebody, please, look into the matter and
COMMISSION THE TRANSFORMER WITHOUT FURTHER DELAY ?
sd.
( C. Jyothi )

to
kerala state electricity board,
vaidyuthi bhavan, pattom,
thiruvananthapuram - 695004



( that is punjabi )

corr_20111125 transformerCommissioningOf



Cheriyath Jyothi B.Sc., M.B.,B.S.,
theCloister,
nr rockPark, venkode P.O.,
Thiruvananthapuram – 695028, IN
( Consumer no.16209-0 kseb )

No.2011/ele/memD                                                                            november 25, 2011

INACTION of KSEB
in the
TRANSFORMER INSTALLATION @ KAYAPADI
(kseb vellanad section, thiruvananthapuram )

as explained in the various representations through letters and eMails with the accompanying photographs, the voltage of power supplied by the kseb over here is a disgrace to any civilised set up.

the installation of a transformer at kayapadi would have brought enormous relief to the locality. The transformer had already been sanctioned ages back and It was with a sigh of relief that ordinary mortals like me saw the work on the installation starting at last.

But even after almost three months of waiting, all that we have at the moment are the repeated long shut offs of even the extreme low voltage supply for most part of the day time in the name of the ongoing work.

I am afraid the concerned authorities are dragging their feet on the installation work of the transformer -
It seems to be an endless wait!
Could somebody, please, look into the matter ?

( C. Jyothi )
20111125

Thursday, November 24, 2011

kseb20111125voltageOnTheRocks



Cheriyath Jyothi B.Sc., M.B.,B.S.,
theCloister,
nr rockPark, venkode P.O.,
Thiruvananthapuram – 695028, IN
( Consumer no.16209-0 kseb )
No.2011/ele/memD                                                                                         november 25, 2011
INACTION of KSEB
in the
TRANSFORMER INSTALLATION @ KAYAPADI
(kseb vellanad section, thiruvananthapuram )

as explained in the various representations through letters and eMails with the accompanying photographs, the voltage of power supplied by the kseb ove here is a disgrace to any civilised set up.

the installation of a transformer at kayapadi would have brought enormous relief to the locality. The transformer had already been sanctioned ages back and It was with a sigh of relief that ordinary mortals like me saw the work on the installation starting at last.

But even after almost three months of waiting, all that we have at the moment are the repeated long shut offs of even the extreme low voltage supply for most part of the day time in the name of the ongoing work.

I am afraid the concerned authorities are dragging their feet on the installation work of the transformer -
It seems to be an endless wait!
Could somebody, please, look into the matter ?

( C. Jyothi )

complaint booked on line at kseb site
Your Token Number is : 742/2011
Please keep this token number inorder for futher reference


letter mailed to chairman kseb  

lelt us see what happens
*   *    *
and for  mock relief here is another letter:-

Cheriyath Jyothi B.Sc., M.B.,B.S.,
theCloister,
nr rockPark, venkode P.O.,
Thiruvananthapuram – 695028, IN

No.2011/ele/a2                                                                                         november 25, 2011

IN ACTION ON
A. COMPLAINT REGARDING EXCESS BILLING
bill no.273019 dt. 04.08.2011, consumer no.16209-0 and
B. VOLTAGE PROBLEM


A. I. please refer
a. Consumer no.16209-0
b. bill no.273019 dt. 04.08.2011 and
c. my letter No.201108/ele/a dt. August 31, 2011 to the ae, vellanad.
i) At the time of issuing the above bill, the reading was not available because what you have installed was a non-functioning meter ( and NOT due to any mistake of mine). Under the circumstances, I would have expected to be charged the minimum rates for the connection.
ii) However I have been given a highly exaggerated bill based on the total load connected.
iii) The above is in spite of the fact, that the voltage of the current supplied by you cannot support anything other than a fluorescent tube with an electronic choke and, that I am paying at the higher rate for construction purposes.
iv) Also, I have been charged for the whole two months where as the connection as far as I remember was established only on june 16, 2011.
v) I was given a verbal assurance that the bill will be adjusted based on the usage for the following months. But as far as my information goes no action has been taken on the matter till date even in the bill that followed.
      1. this is to request of you again to refund the extra amount taken from me without further delay.

B. as elaborated in my earlier letters, the voltage of electricity supplied here by kseb is a disgrace to any civilised set up.
And you, I am afraid, rather than expediting the procedure, have been dragging your feet ( for almost three months now ? ) on the installation of a transformer at kayapadi which could have brought enormous relief to the locality – a pity indeed.
THANK YOU VERY MUCH.
( C. Jyothi )
to
the assistant engineer
kerala state electricity board, vellanad,
thiruvananthapuram.




viceManVerses

* * *